Edged Energy Nfl
505 N WILDWOOD DR
Exact coordinate
A permit or approval is on record. Construction may not have started.
Status inferred from epa frs active 518210 (Sun, 06 Se). No filing states it in as many words.
- Status
- Permitted (inferred)
- Owner
- Edged Energy
- Capacity
- 24 MW directory claim
- Location known to
- Exact coordinate
- County
- Dallas County
- State
- Texas
- Electric utility
- Not identified
- Grid operator
- ERCOT
Location and nearby
Edged Energy Nfl is on record as permitted in Dallas County, Texas. A directory lists its capacity at 24 MW; no filing we hold states a figure. 104 other campuses are on record within 25 miles, 13 of them within 5 miles. The nearest is 0.1 mi away, measured between approximate points.
Nearest of each kind: Operating 0.1 mi Under construction 6.8 mi Permitted 13.4 mi Proposed 3.4 mi
Nearest campuses on record
- 0.1 mi approximate
Operating · Dallas County, TX
- 2.0 mi
Operating · Dallas County, TX
- 2.5 mi
DataBank Dallas Empire Central Data Center
Operating · Dallas County, TX
- 2.5 mi
Operating · Dallas County, TX
- 2.5 mi
Operating · Dallas County, TX
- 2.6 mi approximate
Operating · Dallas County, TX
What is on record
Owner
Edged Energy Strong
The chain
-
permittee name as filed with EPA
EDGED ENERGY NFL
EPA ECHO Exporter, all facilities (weekly refresh) · Sep 6, 2026
Filed by: EDGED ENERGY NFL
- Address on file
- 505 N WILDWOOD DR
- Capacity
- 24 MW as reported by dce, not from a filing
- Building area
- 168,610 sq ft
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- EDGED ENERGY NFL
How the status changed
- Operating Jun 18, 2026 inferred
DCE status 'operating'
- Permitted Sep 6, 2026 inferred
epa frs active 518210
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Exact coordinate
A coordinate as filed with a government agency.
Independent sources
2
directory, federal permit. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| EPA ECHO Exporter, all facilities (weekly refresh) US | Primary | REGISTRY_ID=110071953300 | Sep 6, 2026 last changed on the server |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=edged-energy-nfl-110071953300 | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Dallas County
Each time we refresh the public records and a new campus appears in Dallas County, you get one short email naming it, with the document behind it.