PowerCampus Dallas by Lancaster Data Center Campus LP
Lancaster, Dallas County, Texas
Approximate area
Recorded as in service.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Operating (inferred)
- Owner
- Capacity
- 300 MW directory claim
- Location known to
- Approximate area
- County
- Dallas County
- State
- Texas
- Electric utility
- Not identified
- Grid operator
- ERCOT
Location and nearby
PowerCampus Dallas by Lancaster Data Center Campus LP is on record as operating in Dallas County, Texas. A directory lists its capacity at 300 MW; no filing we hold states a figure. 70 other campuses are on record within 25 miles, 22 of them within 5 miles. The nearest is 0.4 mi away, measured between approximate points.
Nearest of each kind: Operating 2.1 mi Under construction 12.7 mi Permitted 2.9 mi Proposed 0.4 mi
Nearest campuses on record
- 0.4 mi approximate
PowerCampus Dallas - Building 1
Proposed · Dallas County, TX
- 2.1 mi approximate
Operating · Ellis County, TX
- 2.2 mi approximate
Proposed · Dallas County, TX
- 2.2 mi approximate
Proposed · Dallas County, TX
- 2.2 mi approximate
Operating · Ellis County, TX
- 2.3 mi approximate
Proposed · Dallas County, TX
What is on record
Owner
Google Confirmed
The chain
-
TX registration lists PowerCampus Dallas by Lancaster Data Center Campus LP with operator Google, LLC
Google, LLC
Texas Comptroller: registered qualifying data center projects (sales tax exemption) · 02/21/2025
- Capacity
- 300 MW as reported by dce, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
How the status changed
- Operating Jun 18, 2026 inferred
DCE status 'operating'
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
2
directory, state registration. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=powercampus-dallas-by-lancaster-data-center-campus-lp | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Dallas County
Each time we refresh the public records and a new campus appears in Dallas County, you get one short email naming it, with the document behind it.