Red Ace data center campus (Keyser Road)
Culpeper County, Culpeper County, Virginia
Approximate area
A permit or approval is on record. Construction may not have started.
Status inferred from agw source doc (Sep 8, 2026). No filing states it in as many words.
- Status
- Permitted (inferred)
- Owner
- Owner not resolved
- Capacity
- not stated
- Location known to
- Approximate area
- County
- Culpeper County
- State
- Virginia
- Electric utility
- Not identified
- Grid operator
- PJM
Location and nearby
Red Ace data center campus (Keyser Road) is on record as permitted in Culpeper County, Virginia. 34 other campuses are on record within 25 miles, 12 of them within 5 miles. The nearest is 1.3 mi away, measured between approximate points.
Nearest of each kind: Operating 2.4 mi Permitted 6.0 mi Proposed 1.3 mi
Nearest campuses on record
- 1.3 mi approximate
Proposed · Culpeper County, VA
- 1.4 mi approximate
Proposed · Culpeper County, VA
- 1.6 mi approximate
Proposed · Culpeper County, VA
- 1.9 mi approximate
Proposed · Culpeper County, VA
- 2.0 mi approximate
Culpeper Tech Park, Tract Master Plan
Proposed · Culpeper County, VA
- 2.0 mi approximate
Proposed · Culpeper County, VA
What is on record
Owner
Owner not resolved
Filed by: Red Ace Capital Management
- Capacity
- not stated
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Red Ace Capital Management
How the status changed
- Permitted Sep 5, 2026 inferred
AI GridWatch stage/outcome: approved|approved; source press
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
tracker lead. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Source cited by AI GridWatch for Red Ace data center campus (Keyser Road): https://www.datacenterdynamics.com/en/news/data-center-campus-in-virginias-culpeper-county-gets-approval/ US-VA | Context | url=https://www.datacenterdynamics.com/en/news/data-center-campus-in-virginias-culpeper-county-gets-approval/ | Sep 5, 2026 retrieved by us |
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=red-ace-keyser-road-culpeper-va | Sep 5, 2026 last changed on the server |
AI GridWatch (aigridwatch.com), CC BY 4.0.
Free email alerts
Know first when a data center is recorded in Culpeper County
Each time we refresh the public records and a new campus appears in Culpeper County, you get one short email naming it, with the document behind it.