Greenlin Park data center
Loudoun County, Virginia
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- 300 MW directory claim
- Location known to
- Approximate area
- County
- Loudoun County
- State
- Virginia
- Electric utility
- Not identified
- Grid operator
- PJM
Location and nearby
Greenlin Park data center is on record as proposed in Loudoun County, Virginia. A directory lists its capacity at 300 MW; no filing we hold states a figure. 386 other campuses are on record within 25 miles, 43 of them within 5 miles. The nearest is 0.1 mi away, measured between approximate points.
Nearest of each kind: Operating 0.38 mi Under construction 6.3 mi Permitted 0.30 mi Proposed 0.1 mi
Nearest campuses on record
- 0.1 mi approximate
Proposed · Loudoun County, VA
- 0.30 mi approximate
Permitted · Loudoun County, VA
- 0.38 mi approximate
Operating · Loudoun County, VA
- 0.57 mi approximate
Loudoun County VA GIS: pipeline (proposed) data center areas #35
Proposed · Loudoun County, VA
- 0.76 mi approximate
Operating · Loudoun County, VA
- 0.79 mi approximate
Loudoun County VA GIS: pipeline (proposed) data center areas #40
Permitted · Loudoun County, VA
What is on record
Owner
Owner not resolved
- Capacity
- 300 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
How the status changed
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=813 | Sep 8, 2026 retrieved by us |
Cleanview (cleanview.co)
Free email alerts
Know first when a data center is recorded in Loudoun County
Each time we refresh the public records and a new campus appears in Loudoun County, you get one short email naming it, with the document behind it.