Level 3 Ashburn
44633 Guilford Drive
Parcel boundary
Recorded as in service.
Status inferred from osm footprint (Jul 28, 2026). No filing states it in as many words.
- Status
- Operating (inferred)
- Owner
- Likely Lumen Technologies
- Capacity
- not stated
- Location known to
- Parcel boundary
- County
- Loudoun County
- State
- Virginia
- Electric utility
- Not identified
- Grid operator
- PJM
Location and nearby
Level 3 Ashburn is on record as operating in Loudoun County, Virginia. 394 other campuses are on record within 25 miles, 158 of them within 5 miles. The nearest is 0.08 mi away.
Nearest of each kind: Operating 0.14 mi Under construction 1.4 mi Permitted 0.28 mi Proposed 0.08 mi
Nearest campuses on record
- 0.08 mi
Proposed · Loudoun County, VA
- 0.14 mi
Operating · Loudoun County, VA
- 0.17 mi
Operating · Loudoun County, VA
- 0.20 mi
Operating · Loudoun County, VA
- 0.23 mi
Centersquare IAD4-A 21561 Beaumeade Circle
Operating · Loudoun County, VA
- 0.24 mi
Centersquare Ashburn IAD4 Data Center
Operating · Loudoun County, VA
What is on record
Owner
Likely Lumen Technologies
One circumstantial signal, not a document chain.
What the signal was
-
OSM operator tag
Lumen Technologies
Overpass data_center query, tile conus-e1 bbox 24.0,-85.0,50.0,-75.0 · Jul 24, 2026
Filed by: Lumen Technologies
- Address on file
- 44633 Guilford Drive
- Capacity
- not stated
- Building area
- 49,022 sq ft
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Lumen Technologies
How the status changed
- Operating Jun 18, 2026 inferred
DCE status 'mapped' (located only, single source)
- Operating Jul 24, 2026 inferred
osm footprint
Overpass data_center query, tile conus-e1 bbox 24.0,-85.0,50.0,-75.0
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Parcel boundary
Matched to an assessor parcel, so the boundary is the parcel.
Independent sources
3
assessor parcel, directory, osm footprint. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
3 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Overpass data_center query, tile conus-e1 bbox 24.0,-85.0,50.0,-75.0 US | Primary | osm=way/300162689 | Jul 24, 2026 stated in the file |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=level-3-ashburn-osmway-300162689 | Jun 18, 2026 last changed on the server |
| Virginia statewide parcels (VGIN) (point queries) US-VA assessor parcel 060290632000, owner of record None, match pin_on_facility | Corroborating | query=39.02217,-77.45759 | Sep 9, 2026 retrieved by us |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Loudoun County
Each time we refresh the public records and a new campus appears in Loudoun County, you get one short email naming it, with the document behind it.