Skip to the content
Data Centers Near Me
Operating Loudoun County · VA

TikTok Data Center

42370 THUNDERBALL DR

Parcel boundary

Recorded as in service.

Get directions
Drawn at the assessor parcel. Other campuses on record nearby are drawn around it.
Status
Operating
Capacity
not stated
Location known to
Parcel boundary
County
Loudoun County
State
Virginia
Electric utility
Not identified
Grid operator
PJM

Location and nearby

TikTok Data Center is on record as operating in Loudoun County, Virginia. 385 other campuses are on record within 25 miles, 105 of them within 5 miles. The nearest is 0.10 mi away.

Nearest of each kind: Operating 0.10 mi Under construction 4.7 mi Permitted 1.1 mi Proposed 0.84 mi

Nearest campuses on record

What is on record

Owner

Compass Datacenters Strong

The chain
  1. owner of record in government GIS layer

    COMPASS DATACENTERS IAD I LLC

    Loudoun County VA GIS: existing data center parcels · Sep 8, 2026

Filed by: COMPASS DATACENTERS IAD I LLC

Sources name more than one company here: ByteDance, Compass Datacenters, Prime Data Centers. That usually means a building with tenants. No source we hold says which is the landlord, so we do not guess.

Address on file
42370 THUNDERBALL DR
Capacity
not stated
Building area
547,475 sq ft
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
COMPASS DATACENTERS IAD I LLC · Compass 42370 Thunderball Drive · Data center at 42370 THUNDERBALL DR · Prime Data Centers · TRUE NORTH · True North Data Centers and 2 more

Buildings and phases

4 distinct buildings, parcels or permits make up this campus.

Name or address Status Permit Area Date
True North Operating B30554590100,B10332820100,B20453710100,B80293260100,B20457790100,B80293260400 547,475 sq ft Sep 8, 2026
Data center at 42370 THUNDERBALL DR Under construction B30554590100 300,570 sq ft Nov 15, 2023
True North Data Centers Operating not stated not stated May 16, 2025
TikTok Data Center Operating not stated not stated Nov 10, 2025

How the status changed

  1. Under construction Nov 15, 2023

    Loudoun County VA GIS: existing and permitted data center buildings: UNDER CONSTRUCTION

    Loudoun County VA GIS: existing and permitted data center buildings

  2. Operating May 16, 2025 inferred

    osm footprint

    Overpass data_center query, tile conus-e1 bbox 24.0,-85.0,50.0,-75.0

  3. Operating Nov 10, 2025 inferred

    osm footprint

    Overpass data_center query, tile conus-e1 bbox 24.0,-85.0,50.0,-75.0

  4. Operating Jun 14, 2026 inferred

    DCE status 'mapped' (located only, single source)

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

  5. Operating Sep 8, 2026

    Loudoun County VA GIS: existing data center parcels: BULT/UNDER CONSTRUCTION Existing

    Loudoun County VA GIS: existing data center parcels

  6. Operating Sep 8, 2026 inferred

    Cleanview status 'Operating'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

About this data

Evidence

Primary record

A government filing, a federal permit, an assessor parcel or the operator’s own page.

Location known to

Parcel boundary

Matched to an assessor parcel, so the boundary is the parcel.

Independent sources

4

assessor parcel, directory, government record, osm footprint. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

7 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Loudoun County VA GIS: existing data center parcels US-VA-Loudoun Primary OBJECTID=89 Sep 8, 2026 retrieved by us
Loudoun County VA GIS: existing and permitted data center buildings US-VA-Loudoun Primary OBJECTID=179 Sep 8, 2026 retrieved by us
Overpass data_center query, tile conus-e1 bbox 24.0,-85.0,50.0,-75.0 US Primary osm=way/1387391200 May 16, 2025 stated in the file
Overpass data_center query, tile conus-e1 bbox 24.0,-85.0,50.0,-75.0 US Primary osm=way/1387391201 Nov 10, 2025 stated in the file
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=2728 Sep 8, 2026 retrieved by us
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US Primary slug=tiktok-data-center-osmway-1387391201 Jun 14, 2026 last changed on the server
Virginia statewide parcels (VGIN) (point queries) US-VA assessor parcel 194103673000, owner of record None, match pin_on_facility Corroborating query=39.04409,-77.53971 Sep 9, 2026 retrieved by us

Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.

Free email alerts

Know first when a data center is recorded in Loudoun County

Each time we refresh the public records and a new campus appears in Loudoun County, you get one short email naming it, with the document behind it.

Explore more