Amazon Summit Technology Park - Building 1
Fredericksburg, Spotsylvania County, Virginia
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from cleanview directory (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- 70 MW directory claim
- Location known to
- Approximate area
- County
- Spotsylvania County
- State
- Virginia
- Electric utility
- Not identified
- Grid operator
- PJM
Location and nearby
Amazon Summit Technology Park - Building 1 is on record as proposed in Spotsylvania County, Virginia. A directory lists its capacity at 70 MW; no filing we hold states a figure. 66 other campuses are on record within 25 miles, 14 of them within 5 miles. The nearest is 0.7 mi away, measured between approximate points.
Nearest of each kind: Operating 2.8 mi Under construction 11.8 mi Permitted 2.0 mi Proposed 0.7 mi
Nearest campuses on record
- 0.7 mi approximate
Amazon Summit Crossing Tech Campus - Building 1
Proposed · Spotsylvania County, VA
- 0.8 mi approximate
Proposed · Spotsylvania County, VA
- 1.3 mi approximate
Amazon Carter's Store Tech Campus - Building 1
Proposed · Spotsylvania County, VA
- 1.4 mi approximate
Amazon Massaponax Tech Campus - Building 1
Proposed · Spotsylvania County, VA
- 2.0 mi approximate
Amazon Data Services Inc. IAD450-456 Cosner Tech Campus
Permitted · Spotsylvania County, VA
- 2.7 mi approximate
Proposed · Spotsylvania County, VA
What is on record
Owner
Owner not resolved
- Capacity
- 70 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Amazon Summit Technology Park - Building 2 · Amazon Summit Technology Park - Building 3 · Amazon Summit Technology Park - Building 4 · Amazon Summit Technology Park - Building 5 · Amazon Summit Technology Park - Building 6 · Summit Technology Park
How the status changed
- Proposed Jun 18, 2026 inferred
DCE status 'proposed'
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
7 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Spotsylvania County
Each time we refresh the public records and a new campus appears in Spotsylvania County, you get one short email naming it, with the document behind it.