Skip to the content
Data Centers Near Me
Under construction (inferred) Douglas County · WA

Microsoft EAT02

875 B Urban Industrial Way

Parcel boundary

Building work is recorded as under way.

Status inferred from osm lifecycle tag (Sep 8, 2026). No filing states it in as many words.

Get directions
Drawn at the assessor parcel. Other campuses on record nearby are drawn around it.
Status
Under construction (inferred)
Owner
Microsoft
Capacity
not stated
Location known to
Parcel boundary
County
Douglas County
State
Washington
Electric utility
Not identified
Grid operator
not stated

Location and nearby

Microsoft EAT02 is on record as under construction in Douglas County, Washington. 22 other campuses are on record within 25 miles, 7 of them within 5 miles. The nearest is 0.73 mi away.

Nearest of each kind: Operating 0.73 mi Under construction 3.1 mi Proposed 4.3 mi

Nearest campuses on record

What is on record

Owner

Microsoft Strong

The chain
  1. owner of record in government GIS layer

    Microsoft

    WSDOT: Washington data centers (buildings) · Sep 8, 2026

Filed by: Microsoft

Address on file
875 B Urban Industrial Way
Capacity
not stated
Building area
246,129 sq ft
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
Microsoft · Microsoft Corporation · Microsoft Data Center LLC · Microsoft EAT03 · Microsoft EAT04 · Microsoft EAT06 and 1 more

Buildings and phases

4 distinct buildings, parcels or permits make up this campus.

Name or address Status Permit Area Date
Microsoft EAT02 Operating not stated not stated Jun 26, 2025
Microsoft EAT03 Operating not stated not stated May 2, 2024
Microsoft EAT04 Under construction not stated not stated May 16, 2023
Microsoft Operating not stated not stated Sep 8, 2026

How the status changed

  1. Under construction May 16, 2023 inferred

    osm lifecycle tag

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  2. Operating May 2, 2024 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  3. Operating Jun 26, 2025 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  4. Operating Jun 14, 2026 inferred

    DCE status 'mapped' (located only, single source)

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

  5. Operating Jun 14, 2026 inferred

    DCE status 'mapped' (located only, single source)

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

  6. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  7. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  8. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  9. Operating Sep 8, 2026 inferred

    WSDOT: other Washington data centers:

    WSDOT: other Washington data centers

  10. Operating Sep 8, 2026 inferred

    Cleanview status 'Operating'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

  11. Operating Sep 8, 2026 inferred

    Cleanview status 'Operating'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

  12. Operating Sep 8, 2026 inferred

    Cleanview status 'Operating'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

  13. Proposed Sep 8, 2026 inferred

    Cleanview status 'Planned'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

  14. Proposed Sep 8, 2026 inferred

    Cleanview status 'Planned'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

About this data

Evidence

Primary record

A government filing, a federal permit, an assessor parcel or the operator’s own page.

Location known to

Parcel boundary

Matched to an assessor parcel, so the boundary is the parcel.

Independent sources

4

assessor parcel, directory, government record, osm footprint. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

15 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/1071772119 Jun 26, 2025 stated in the file
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/1173537116 May 2, 2024 stated in the file
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/1173537117 May 16, 2023 stated in the file
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=849 Sep 8, 2026 retrieved by us
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=923 Sep 8, 2026 retrieved by us
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=924 Sep 8, 2026 retrieved by us
WSDOT: other Washington data centers US-WA Primary OBJECTID=2 Sep 8, 2026 retrieved by us
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=3493 Sep 8, 2026 retrieved by us
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=3494 Sep 8, 2026 retrieved by us
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=3495 Sep 8, 2026 retrieved by us
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=3496 Sep 8, 2026 retrieved by us
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=3497 Sep 8, 2026 retrieved by us
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US Primary slug=microsoft-eat03-osmway-1173537116 Jun 14, 2026 last changed on the server
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US Primary slug=microsoft-eat04-osmway-1173537117 Jun 14, 2026 last changed on the server
Washington statewide current parcels (WA Geoservices) (point queries) US-WA assessor parcel 017-22210920004, owner of record None, match pin_on_facility Corroborating query=47.41687,-120.20769 Sep 9, 2026 retrieved by us

Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.

Free email alerts

Know first when a data center is recorded in Douglas County

Each time we refresh the public records and a new campus appears in Douglas County, you get one short email naming it, with the document behind it.

Explore more