Skip to the content
Data Centers Near Me
Operating (inferred) Douglas County · WA

WSDOT: Washington data centers (buildings) #654

748 S BILLINGSLEY DR

Parcel boundary

Recorded as in service.

Status inferred from osm footprint (Sep 8, 2026). No filing states it in as many words.

Get directions
Drawn at the assessor parcel. Other campuses on record nearby are drawn around it.
Status
Operating (inferred)
Owner
Owner not resolved
Capacity
not stated
Location known to
Parcel boundary
County
Douglas County
State
Washington
Electric utility
Not identified
Grid operator
not stated

Location and nearby

WSDOT: Washington data centers (buildings) #654 is on record as operating in Douglas County, Washington. 22 other campuses are on record within 25 miles, 7 of them within 5 miles. The nearest is 1.1 mi away.

Nearest of each kind: Operating 1.1 mi Under construction 1.6 mi Proposed 4.1 mi

Nearest campuses on record

What is on record

Owner

Owner not resolved

Address on file
748 S BILLINGSLEY DR
Capacity
not stated
Building area
13,946 sq ft
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
Unnamed data center (way/814061068) · Unnamed data center (way/814061069) · Unnamed data center (way/814061070) · Unnamed data center (way/814061071) · WSDOT: Washington data centers (buildings) #655 · WSDOT: Washington data centers (buildings) #656 and 2 more

Buildings and phases

5 distinct buildings, parcels or permits make up this campus.

Name or address Status Permit Area Date
Unnamed data center (way/814061068) Operating not stated not stated Jun 20, 2022
Unnamed data center (way/814061069) Operating not stated not stated Jun 20, 2022
Unnamed data center (way/814061070) Operating not stated not stated Jun 20, 2022
Unnamed data center (way/814061071) Operating not stated not stated Jun 20, 2022
WSDOT: other Washington data centers #4 Operating not stated not stated Sep 8, 2026

How the status changed

  1. Operating Jun 20, 2022 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  2. Operating Jun 20, 2022 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  3. Operating Jun 20, 2022 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  4. Operating Jun 20, 2022 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  5. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  6. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  7. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  8. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  9. Operating Sep 8, 2026 inferred

    WSDOT: other Washington data centers:

    WSDOT: other Washington data centers

About this data

Evidence

Primary record

A government filing, a federal permit, an assessor parcel or the operator’s own page.

Location known to

Parcel boundary

Matched to an assessor parcel, so the boundary is the parcel.

Independent sources

3

assessor parcel, government record, osm footprint. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

10 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/814061068 Jun 20, 2022 stated in the file
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/814061069 Jun 20, 2022 stated in the file
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/814061070 Jun 20, 2022 stated in the file
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/814061071 Jun 20, 2022 stated in the file
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=654 Sep 8, 2026 retrieved by us
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=655 Sep 8, 2026 retrieved by us
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=656 Sep 8, 2026 retrieved by us
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=657 Sep 8, 2026 retrieved by us
WSDOT: other Washington data centers US-WA Primary OBJECTID=4 Sep 8, 2026 retrieved by us
Washington statewide current parcels (WA Geoservices) (point queries) US-WA assessor parcel 017-76600001700, owner of record None, match pin_on_facility Corroborating query=47.39215,-120.21746 Sep 9, 2026 retrieved by us

Free email alerts

Know first when a data center is recorded in Douglas County

Each time we refresh the public records and a new campus appears in Douglas County, you get one short email naming it, with the document behind it.

Explore more