Skip to the content
Data Centers Near Me
Operating (inferred) Grant County · WA

H5 Data Center Quincy

1711 M ST NE

Parcel boundary

Recorded as in service.

Status inferred from osm footprint+epa permit (Sun, 06 Se). No filing states it in as many words.

Get directions
Drawn at the assessor parcel. Other campuses on record nearby are drawn around it.
Status
Operating (inferred)
Owner
Yahoo
Capacity
not stated
Location known to
Parcel boundary
County
Grant County
State
Washington
Electric utility
Not identified
Grid operator
not stated

Location and nearby

H5 Data Center Quincy is on record as operating in Grant County, Washington. 23 other campuses are on record within 25 miles, 14 of them within 5 miles. The nearest is 0.25 mi away.

Nearest of each kind: Operating 0.25 mi Under construction 17.7 mi

Nearest campuses on record

What is on record

Owner

Yahoo Strong

The chain
  1. assessor parcel owner of record

    Yahoo Holdings Inc

    Grant County WA parcels (point queries) · Sep 9, 2026

Filed by: H5 DATA CENTER QUINCY

Sources name more than one company here: H5 Data Centers, Prime Data Centers, Yahoo. That usually means a building with tenants. No source we hold says which is the landlord, so we do not guess.

Address on file
1711 M ST NE
Capacity
not stated
Building area
246,778 sq ft
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
H5 DATA CENTER QUINCY · H5 Data Center · H5 Data Centers · H5 Quincy I - Building 1 · Intuit · Prime Data Centers and 2 more

Buildings and phases

3 distinct buildings, parcels or permits make up this campus.

Name or address Status Permit Area Date
H5 Data Center Operating not stated not stated Sep 2, 2024
Unnamed data center (way/283051475) Operating not stated not stated Nov 24, 2023
H5 Data Centers Operating not stated not stated Sep 8, 2026

How the status changed

  1. Operating Nov 24, 2023 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  2. Operating Sep 2, 2024 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  3. Operating Sep 2, 2024 inferred

    OSM footprint plus EPA permit

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  4. Operating Jun 18, 2026 inferred

    DCE status 'operating'

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

  5. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  6. Operating Sep 8, 2026 inferred

    WSDOT: Quincy WA data centers:

    WSDOT: Quincy WA data centers

  7. Operating Sep 8, 2026 inferred

    Cleanview status 'Operating'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

  8. Permitted Sep 6, 2026 inferred

    epa frs active 518210

    EPA ECHO Exporter, all facilities (weekly refresh)

About this data

Evidence

Primary record

A government filing, a federal permit, an assessor parcel or the operator’s own page.

Location known to

Parcel boundary

Matched to an assessor parcel, so the boundary is the parcel.

Independent sources

5

assessor parcel, directory, federal permit, government record, osm footprint. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

8 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110070123470 Sep 6, 2026 last changed on the server
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/283051474 Sep 2, 2024 stated in the file
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/283051475 Nov 24, 2023 stated in the file
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=205 Sep 8, 2026 retrieved by us
WSDOT: Quincy WA data centers US-WA-Grant Primary OBJECTID=5 Sep 8, 2026 retrieved by us
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=4135 Sep 8, 2026 retrieved by us
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US Primary slug=h5-data-center-osmway-283051474 Jun 18, 2026 last changed on the server
Grant County WA parcels (point queries) US-WA assessor parcel 313856000, owner of record Yahoo Holdings Inc, match pin_on_facility Corroborating query=47.24857,-119.81928 Sep 9, 2026 retrieved by us

Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.

Free email alerts

Know first when a data center is recorded in Grant County

Each time we refresh the public records and a new campus appears in Grant County, you get one short email naming it, with the document behind it.

Explore more