Vantage Data Centers
2117 NE M ST, QUINCY
Parcel boundary
Recorded as in service.
Status inferred from osm footprint (Sep 8, 2026). No filing states it in as many words.
- Status
- Operating (inferred)
- Owner
- Vantage Data Centers
- Capacity
- not stated
- Location known to
- Parcel boundary
- County
- Grant County
- State
- Washington
- Electric utility
- Not identified
- Grid operator
- not stated
Location and nearby
Vantage Data Centers is on record as operating in Grant County, Washington. 23 other campuses are on record within 25 miles, 14 of them within 5 miles. The nearest is 0.17 mi away.
Nearest of each kind: Operating 0.17 mi Under construction 17.8 mi
Nearest campuses on record
- 0.17 mi
Operating · Grant County, WA
- 0.27 mi
Operating · Grant County, WA
- 0.38 mi
Operating · Grant County, WA
- 0.65 mi
WSDOT: Washington data centers (buildings) #434
Operating · Grant County, WA
- 0.77 mi
Operating · Grant County, WA
- 0.96 mi
Oath Holdings Incorporated Data Center
Operating · Grant County, WA
What is on record
Owner
Vantage Data Centers Strong
The chain
-
assessor parcel owner of record
Vantage Data Centers WA13 LLC
Grant County WA parcels (point queries) · Sep 9, 2026
Filed by: Vantage Data Centers WA13 LLC
- Address on file
- 2117 NE M ST, QUINCY
- Capacity
- not stated
- Building area
- 252,025 sq ft
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Vantage Data Centers Holdings, LLC · Vantage WA11 · Vantage WA12 · Vantage WA13
Buildings and phases
4 distinct buildings, parcels or permits make up this campus.
| Name or address | Status | Permit | Area | Date |
|---|---|---|---|---|
| Vantage WA13 | Operating | not stated | not stated | Dec 19, 2024 |
| Vantage WA11 | Operating | not stated | not stated | Dec 19, 2024 |
| Vantage WA12 | Operating | not stated | not stated | Dec 19, 2024 |
| Vantage Data Centers | Operating | not stated | not stated | Sep 8, 2026 |
How the status changed
- Operating Dec 19, 2024 inferred
osm footprint
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0
- Operating Dec 19, 2024 inferred
osm footprint
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0
- Operating Dec 19, 2024 inferred
osm footprint
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0
- Operating Jun 14, 2026 inferred
DCE status 'mapped' (located only, single source)
- Operating Sep 8, 2026 inferred
WSDOT: Washington data centers (buildings): building
- Operating Sep 8, 2026 inferred
WSDOT: Washington data centers (buildings): building
- Operating Sep 8, 2026 inferred
WSDOT: Washington data centers (buildings): building
- Operating Sep 8, 2026 inferred
WSDOT: Quincy WA data centers:
- Operating Sep 8, 2026 inferred
Cleanview status 'Operating'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Operating Sep 8, 2026 inferred
Cleanview status 'Operating'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Parcel boundary
Matched to an assessor parcel, so the boundary is the parcel.
Independent sources
4
assessor parcel, directory, government record, osm footprint. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
11 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US | Primary | osm=way/1343760339 | Dec 19, 2024 stated in the file |
| Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US | Primary | osm=way/337127817 | Dec 19, 2024 stated in the file |
| Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US | Primary | osm=way/694602725 | Dec 19, 2024 stated in the file |
| WSDOT: Washington data centers (buildings) US-WA | Primary | OBJECTID=1101 | Sep 8, 2026 retrieved by us |
| WSDOT: Washington data centers (buildings) US-WA | Primary | OBJECTID=269 | Sep 8, 2026 retrieved by us |
| WSDOT: Washington data centers (buildings) US-WA | Primary | OBJECTID=557 | Sep 8, 2026 retrieved by us |
| WSDOT: Quincy WA data centers US-WA-Grant | Primary | OBJECTID=6 | Sep 8, 2026 retrieved by us |
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=4103 | Sep 8, 2026 retrieved by us |
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=4104 | Sep 8, 2026 retrieved by us |
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=vantage-wa13-osmway-1343760339 | Jun 14, 2026 last changed on the server |
| Grant County WA parcels (point queries) US-WA assessor parcel 040411116, owner of record Vantage Data Centers WA13 LLC, match owner_names_operator | Corroborating | query=47.25253,-119.81362 | Sep 9, 2026 retrieved by us |
Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Grant County
Each time we refresh the public records and a new campus appears in Grant County, you get one short email naming it, with the document behind it.