Skip to the content
Data Centers Near Me
Operating (inferred) King County · WA

Sabey Data Centers Seattle

3311 South 120th Place

Parcel boundary

Recorded as in service.

Status inferred from osm footprint (Sep 8, 2026). No filing states it in as many words.

Get directions
Drawn at the assessor parcel. Other campuses on record nearby are drawn around it.
Status
Operating (inferred)
Capacity
not stated
Location known to
Parcel boundary
County
King County
State
Washington
Electric utility
Not identified
Grid operator
CAISO

Location and nearby

Sabey Data Centers Seattle is on record as operating in King County, Washington. 23 other campuses are on record within 25 miles, 5 of them within 5 miles. The nearest is 0.11 mi away.

Nearest of each kind: Operating 0.11 mi Permitted 24.0 mi

Nearest campuses on record

What is on record

Owner

Sabey Data Centers Strong

The chain
  1. owner of record in government GIS layer

    Sabey

    WSDOT: Washington data centers (buildings) · Sep 8, 2026

Filed by: Sabey

Sources name more than one company here: Digital Realty, Sabey Data Centers. That usually means a building with tenants. No source we hold says which is the landlord, so we do not guess.

Address on file
3311 South 120th Place
Capacity
not stated
Building area
107,319 sq ft
Diesel generators
No air permit found in the records we collect
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
Digital Realty · Digital Realty Trust, Inc. · Intergate Seattle East Building 2 · Intergate Seattle East Building 3 · Intergate Seattle East Building 4 · Sabey and 1 more

Buildings and phases

4 distinct buildings, parcels or permits make up this campus.

Name or address Status Permit Area Date
Intergate Seattle East Building 2 Operating not stated not stated Mar 27, 2024
Intergate Seattle East Building 3 Operating not stated not stated Mar 28, 2024
Intergate Seattle East Building 4 Operating not stated not stated Mar 28, 2024
Sabey Data Centers Seattle Operating not stated not stated Sep 8, 2026

How the status changed

  1. Operating Mar 27, 2024 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  2. Operating Mar 28, 2024 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  3. Operating Mar 28, 2024 inferred

    osm footprint

    Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0

  4. Operating Jun 14, 2026 inferred

    DCE status 'mapped' (located only, single source)

    dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.)

  5. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  6. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  7. Operating Sep 8, 2026 inferred

    WSDOT: Washington data centers (buildings): building

    WSDOT: Washington data centers (buildings)

  8. Operating Sep 8, 2026 inferred

    WSDOT: other Washington data centers:

    WSDOT: other Washington data centers

  9. Operating Sep 8, 2026 inferred

    Cleanview status 'Operating'

    Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)

About this data

Evidence

Primary record

A government filing, a federal permit, an assessor parcel or the operator’s own page.

Location known to

Parcel boundary

Matched to an assessor parcel, so the boundary is the parcel.

Independent sources

4

assessor parcel, directory, government record, osm footprint. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

10 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/205724881 Mar 27, 2024 stated in the file
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/293211686 Mar 28, 2024 stated in the file
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US Primary osm=way/293211687 Mar 28, 2024 stated in the file
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=123 Sep 8, 2026 retrieved by us
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=222 Sep 8, 2026 retrieved by us
WSDOT: Washington data centers (buildings) US-WA Primary OBJECTID=223 Sep 8, 2026 retrieved by us
WSDOT: other Washington data centers US-WA Primary OBJECTID=5 Sep 8, 2026 retrieved by us
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US Primary id=1266 Sep 8, 2026 retrieved by us
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US Primary slug=intergate-seattle-east-building-4-osmway-293211687 Jun 14, 2026 last changed on the server
Washington statewide current parcels (WA Geoservices) (point queries) US-WA assessor parcel 033-1023049078, owner of record None, match pin_on_facility Corroborating query=47.49503,-122.29057 Sep 9, 2026 retrieved by us

Cleanview (cleanview.co) © DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.

Free email alerts

Know first when a data center is recorded in King County

Each time we refresh the public records and a new campus appears in King County, you get one short email naming it, with the document behind it.

Explore more