Mountaineer Gigasystem/ Monarch Cloud Campus
Point Pleasant, Mason County, West Virginia
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not independently traced
- Capacity
- 2,000 MW directory claim
- Location known to
- Approximate area
- County
- Mason County
- State
- West Virginia
- Electric utility
- Appalachian Power Co
- Grid operator
- PJM
Location and nearby
Mountaineer Gigasystem/ Monarch Cloud Campus is on record as proposed in Mason County, West Virginia. A directory lists its capacity at 2,000 MW; no filing we hold states a figure. 6 other campuses are on record within 25 miles, 4 of them within 5 miles. The nearest is 0.4 mi away, measured between approximate points.
Nearest of each kind: Under construction 11.7 mi Proposed 0.4 mi
Nearest campuses on record
- 0.4 mi approximate
Monarch Compute Campus - Phase 2
Proposed · Mason County, WV
- 0.8 mi approximate
Monarch Compute Campus - Building 2
Proposed · Mason County, WV
- 0.9 mi approximate
Monarch Compute Campus - Building 3
Proposed · Mason County, WV
- 5.0 mi approximate
Mountaineer GigaSystem / Monarch
Proposed · Mason County, WV
- 11.7 mi approximate
Under construction · Mason County, WV
- 20.7 mi approximate
Proposed · Putnam County, WV
What is on record
Owner
Owner not independently traced
Listed as Fidelis/Nscale by DataCentersExposed. We have not verified that against a filing.
What the signal was
-
dce directory attribution
Fidelis/Nscale
dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) · Jun 18, 2026
Filed by: Fidelis
- Capacity
- 2,000 MW as reported by dce, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- Appalachian Power Co
- Also recorded as
- Fidelis/Nscale · Nscale
How the status changed
- Proposed Jun 18, 2026 inferred
DCE status 'proposed'
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=mountaineer-gigasystem-monarch-cloud-campus | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Mason County
Each time we refresh the public records and a new campus appears in Mason County, you get one short email naming it, with the document behind it.