Skip to the content
Data Centers Near Me

California

Data centers in Los Angeles County

37 campuses are on record here. 1 more was withdrawn or rejected and is kept for the record.

Operating

16

Permitted

17

Proposed

4

Withdrawn

1

All 38 on record here have a coordinate.

Every campus on record

Open the printable report for Los Angeles County

Data centers in Los Angeles County
Campus Status Owner Capacity
800 south hope directory listing, unverified Operating (inferred) not resolved not stated
Amazon Data Services, Inc - LAX3 Operating (inferred) Amazon (AWS) not stated
AT&T Operating (inferred) not resolved not stated
Centersquare LAX4 directory listing, unverified Operating (inferred) not traced not stated
Centurylink data center Operating (inferred) likely Lumen Technologies not stated
Centurylink data center Operating (inferred) likely Lumen Technologies not stated
ColoCrossing: LA01 directory listing, unverified Operating (inferred) not resolved not stated
CoreSite - LA2 Operating (inferred) likely United States Postal Service not stated
Drt LAX12 Operating (inferred) likely Digital Realty not stated
Equinix Operating (inferred) likely Equinix not stated
Equinix Operating Co Inc. (LA1) Operating (inferred) Equinix not stated
Evocative LAX14 directory listing, unverified Operating (inferred) not resolved not stated
Fireline Data Center directory listing, unverified Operating (inferred) not resolved not stated
Level(3) Los Angeles directory listing, unverified Operating (inferred) not traced not stated
QuadraNet LAX directory listing, unverified Operating (inferred) not resolved not stated
Serverfarm - LAX1 Operating (inferred) likely Serverfarm LLC. not stated
Amazon Data Services, Inc - LAX50 Permitted (inferred) Amazon (AWS) not stated
Amazon Data Services, Inc - LAX51 Permitted (inferred) Amazon (AWS) not stated
At Designs Inc Permitted (inferred) not resolved not stated
Blair Commercial Management Permitted (inferred) not resolved not stated
Cogent Communications Permitted (inferred) not resolved not stated
Cogent Communications Permitted (inferred) not resolved not stated
Cyxtera - LAX3 Permitted (inferred) CenterSquare not stated
Equinix Douglas St. Fuel Cell Permitted (inferred) Equinix not stated
Evoque - LAX2 Permitted (inferred) CenterSquare not stated
Prime Data Centers Permitted (inferred) Prime Data Centers not stated
Schindler Bloomington Permitted (inferred) not resolved not stated
Schindler Elevator Permitted (inferred) not resolved not stated
Schindler Elevator Permitted (inferred) not resolved not stated
Siof 1 Properties LLC Permitted (inferred) not resolved not stated
Tk Corp Permitted (inferred) not resolved not stated
Vectorusa Permitted (inferred) not resolved not stated
Warner Gateway Company Permitted (inferred) not resolved not stated
AWS directory listing, unverified Proposed (inferred) not resolved not stated
DataBank Vernon LA Data Center directory listing, unverified Proposed (inferred) not resolved not stated
Digital Realty Vernon Data Center directory listing, unverified Proposed (inferred) not traced not stated
LAX01 directory listing, unverified Proposed (inferred) not resolved not stated
1977 Saturn Data Center directory listing, unverified Withdrawn (inferred) not traced not stated

Capacity

Megawatts are only as good as the source. These two lines are never added together.

On record from a filing
not stated
0 of 38 campuses
As reported by directories
283 MW
11 of 38 campuses, unverified