Virginia
Data centers in Manassas city
5 campuses are on record here.
Operating
2
Under construction
1
Permitted
1
Proposed
1
Every campus on record
Open the printable report for Manassas city
| Campus | Status | Owner | Capacity |
|---|---|---|---|
| Amazon Web Services | Operating (inferred) | likely Amazon (AWS) | not stated |
| Digital Realty IAD53 - 9905 Godwin Drive | Operating (inferred) | not resolved | not stated |
| Microsoft Manassas (Hansen Farm) directory listing, unverified | Under construction (inferred) | not traced | not stated |
| QTS Investment Properties Manassas LLC | Permitted | QTS | not stated |
| STACK Infrastructure NVA02 | Proposed (inferred) | likely STACK Infrastructure | not stated |
Capacity
Megawatts are only as good as the source. These two lines are never added together.
- On record from a filing
- not stated
- 0 of 5 campuses
- As reported by directories
- 224 MW
- 3 of 5 campuses, unverified