A1 Data Center (Millville)
Millville, Cumberland County, New Jersey
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from agw source doc (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- 1,400 MW
- Location known to
- Approximate area
- County
- Cumberland County
- State
- New Jersey
- Electric utility
- Not identified
- Grid operator
- PJM
Location and nearby
A1 Data Center (Millville) is on record as proposed in Cumberland County, New Jersey. A record puts its capacity at 1,400 MW. 3 other campuses are on record within 25 miles, 1 of them within 5 miles. The nearest is 2.9 mi away, measured between approximate points.
Nearest of each kind: Permitted 6.9 mi Proposed 2.9 mi
Nearest campuses on record
- 2.9 mi approximate
Nebius / DataOne Vineland Phase 2
Proposed · Cumberland County, NJ
- 6.9 mi approximate
DataOne USA / Nebius Vineland (Microsoft)
Permitted · Cumberland County, NJ
- 20.2 mi approximate
Hexa Builders data center (Black Horse Pike)
Proposed · Gloucester County, NJ
What is on record
Owner
Owner not resolved
- Capacity
- 1,400 MW from agw
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
How the status changed
- Proposed Aug 30, 2026 inferred
AI GridWatch stage/outcome: blocked by ban|moratorium; source press
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
tracker lead. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Source cited by AI GridWatch for A1 Data Center (Millville): https://newjersey.news12.com/2026/05/20/millville-bans-data-centers-killing-largest-proposed-facility-in-new-jersey-hist US-NJ | Context | url=https://newjersey.news12.com/2026/05/20/millville-bans-data-centers-killing-largest-proposed-facility-in-new-jersey-history/77eDMHsKNvb6HkPeGLzLLN | Aug 30, 2026 retrieved by us |
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=a1-data-center-millville-nj | Aug 30, 2026 last changed on the server |
AI GridWatch (aigridwatch.com), CC BY 4.0.
Free email alerts
Know first when a data center is recorded in Cumberland County
Each time we refresh the public records and a new campus appears in Cumberland County, you get one short email naming it, with the document behind it.