Hexa Builders data center (Black Horse Pike)
Monroe Township (Gloucester County), Gloucester County, New Jersey
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from agw source doc (Sep 8, 2026). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- not stated
- Location known to
- Approximate area
- County
- Gloucester County
- State
- New Jersey
- Electric utility
- Not identified
- Grid operator
- PJM
Location and nearby
Hexa Builders data center (Black Horse Pike) is on record as proposed in Gloucester County, New Jersey. 10 other campuses are on record within 25 miles. The nearest is 13.3 mi away, measured between approximate points.
Nearest of each kind: Operating 15.1 mi Permitted 13.3 mi Proposed 17.5 mi
Nearest campuses on record
- 13.3 mi approximate
DataOne USA / Nebius Vineland (Microsoft)
Permitted · Cumberland County, NJ
- 15.1 mi approximate
Unnamed data center (way/607483487)
Operating · Gloucester County, NJ
- 17.5 mi approximate
Permitted · Philadelphia County, PA
- 17.5 mi approximate
Nebius / DataOne Vineland Phase 2
Proposed · Cumberland County, NJ
- 20.2 mi approximate
Proposed · Cumberland County, NJ
- 21.2 mi approximate
Quonix Datacenter (2401 Locust St)
Operating · Philadelphia County, PA
What is on record
Owner
Owner not resolved
Filed by: Hexa Builders LLC
- Capacity
- not stated
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Hexa Builders LLC
How the status changed
- Proposed Aug 7, 2026 inferred
AI GridWatch stage/outcome: in review|; source press
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
tracker lead. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Source cited by AI GridWatch for Hexa Builders data center (Black Horse Pike): https://wjrz.com/2026/07/30/hexa-files-300m-lawsuit-against-monroe-township-over-data-center-prohibition/ US-NJ | Context | url=https://wjrz.com/2026/07/30/hexa-files-300m-lawsuit-against-monroe-township-over-data-center-prohibition/ | Aug 7, 2026 retrieved by us |
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=hexa-monroe-township-nj | Aug 7, 2026 last changed on the server |
AI GridWatch (aigridwatch.com), CC BY 4.0.
Free email alerts
Know first when a data center is recorded in Gloucester County
Each time we refresh the public records and a new campus appears in Gloucester County, you get one short email naming it, with the document behind it.