Stack Infrastructure - POR03
4735 Northeast Starr Boulevard
Building outline
Recorded as in service.
Status inferred from osm footprint (Sep 8, 2026). No filing states it in as many words.
- Status
- Operating (inferred)
- Owner
- Likely STACK Infrastructure
- Capacity
- 31 MW directory claim
- Location known to
- Building outline
- County
- Washington County
- State
- Oregon
- Electric utility
- Not identified
- Grid operator
- CAISO
Location and nearby
Stack Infrastructure - POR03 is on record as operating in Washington County, Oregon. A directory lists its capacity at 31 MW; no filing we hold states a figure. 39 other campuses are on record within 25 miles, 28 of them within 5 miles. The nearest is 0.07 mi away.
Nearest of each kind: Operating 0.07 mi Under construction 0.11 mi Proposed 1.1 mi
Nearest campuses on record
- 0.07 mi
Flexential Portland - Hillsboro 4
Operating · Washington County, OR
- 0.11 mi
Flexential Portland - Hillsboro 4 Expansion
Operating · Washington County, OR
- 0.11 mi
Under construction · Washington County, OR
- 0.37 mi
Flexential Portland - Hillsboro 3
Operating · Washington County, OR
- 0.43 mi
Operating · Washington County, OR
- 0.47 mi
Operating · Washington County, OR
What is on record
Owner
Likely STACK Infrastructure
One circumstantial signal, not a document chain.
What the signal was
-
OSM operator tag
Stack Infrastructure
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 · Apr 21, 2026
Filed by: Stack Infrastructure
- Address on file
- 4735 Northeast Starr Boulevard
- Capacity
- 31 MW as reported by cleanview, not from a filing
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- More than one utility serves this county, and no filing we hold names which one
- Also recorded as
- Stack Infrastructure · Stack Infrastructure POR03A · Stack Infrastructure POR03B · Stack Infrastructure POR03C · Stack Infrastructure POR03E
Buildings and phases
3 distinct buildings, parcels or permits make up this campus.
| Name or address | Status | Permit | Area | Date |
|---|---|---|---|---|
| Stack Infrastructure - POR03 | Operating | not stated | not stated | Apr 21, 2026 |
| Stack Infrastructure - POR03 | Operating | not stated | not stated | Apr 21, 2026 |
| Stack Infrastructure - POR03 | Operating | not stated | not stated | Apr 21, 2026 |
How the status changed
- Operating Apr 21, 2026 inferred
osm footprint
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0
- Operating Apr 21, 2026 inferred
osm footprint
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0
- Operating Apr 21, 2026 inferred
osm footprint
Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0
- Operating Sep 8, 2026 inferred
Cleanview status 'Operating'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Operating Sep 8, 2026 inferred
Cleanview status 'Operating'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Operating Sep 8, 2026 inferred
Cleanview status 'Operating'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
- Proposed Sep 8, 2026 inferred
Cleanview status 'Planned'
Cleanview state pages: facility markers (id, name, coordinates, status, MW, county)
About this data
Evidence
Map footprint and directories
An OpenStreetMap footprint plus one or more directories. No filing behind it.
Location known to
Building outline
A mapped building outline.
Independent sources
2
directory, osm footprint. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
7 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US | Primary | osm=way/1243089554 | Apr 21, 2026 stated in the file |
| Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US | Primary | osm=way/1243089555 | Apr 21, 2026 stated in the file |
| Overpass data_center query, tile conus-w1 bbox 24.0,-125.0,50.0,-115.0 US | Primary | osm=way/899634245 | Apr 21, 2026 stated in the file |
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=1068 | Sep 8, 2026 retrieved by us |
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=1069 | Sep 8, 2026 retrieved by us |
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=1075 | Sep 8, 2026 retrieved by us |
| Cleanview state pages: facility markers (id, name, coordinates, status, MW, county) US | Primary | id=4110 | Sep 8, 2026 retrieved by us |
Cleanview (cleanview.co)
Free email alerts
Know first when a data center is recorded in Washington County
Each time we refresh the public records and a new campus appears in Washington County, you get one short email naming it, with the document behind it.