xAI Colossus
Memphis (Shelby County), Shelby County, Tennessee
Approximate area
A permit or approval is on record. Construction may not have started.
Status inferred from agw source doc (Sep 8, 2026). No filing states it in as many words.
- Status
- Permitted (inferred)
- Owner
- Likely x-corp
- Capacity
- 2,000 MW
- Location known to
- Approximate area
- County
- Shelby County
- State
- Tennessee
- Electric utility
- City of Memphis - (TN)
- Grid operator
- not stated
Location and nearby
xAI Colossus is on record as permitted in Shelby County, Tennessee. A record puts its capacity at 2,000 MW. 17 other campuses are on record within 25 miles, 4 of them within 5 miles. The nearest is 0.15 mi away, measured between approximate points.
Nearest of each kind: Operating 0.36 mi Under construction 5.4 mi Permitted 0.15 mi Proposed 4.8 mi
Nearest campuses on record
- 0.15 mi approximate
Permitted · Shelby County, TN
- 0.36 mi approximate
Operating · Shelby County, TN
- 4.8 mi approximate
Google West Memphis - Building 1
Proposed · Crittenden County, AR
- 5.0 mi approximate
Google West Memphis - Building 3
Proposed · Crittenden County, AR
- 5.4 mi approximate
Under construction · Crittenden County, AR
- 5.7 mi approximate
Proposed · Shelby County, TN
What is on record
Owner
Likely x-corp
A tracker names this operator and cites a source we have not read ourselves, so it is not traced to a record.
What the signal was
-
cited document names the operator
x-corp
Source cited by AI GridWatch for xAI Colossus: https://earthjustice.org/case/xai-illegal-gas-power-plant-data-center-colossus · Aug 7, 2026
Filed by: xAI
- Capacity
- 2,000 MW from agw
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- City of Memphis - (TN)
- Also recorded as
- xAI
How the status changed
- Permitted Aug 7, 2026 inferred
AI GridWatch stage/outcome: approved|approved; source press
About this data
Evidence
Primary record
A government filing, a federal permit, an assessor parcel or the operator’s own page.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway.
Independent sources
1
cited filing. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
2 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| Source cited by AI GridWatch for xAI Colossus: https://earthjustice.org/case/xai-illegal-gas-power-plant-data-center-colossus US-TN | Context | url=https://earthjustice.org/case/xai-illegal-gas-power-plant-data-center-colossus | Aug 7, 2026 retrieved by us |
| agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US | Context | id=xai-colossus-memphis-tn | Aug 7, 2026 last changed on the server |
AI GridWatch (aigridwatch.com), CC BY 4.0.
Free email alerts
Know first when a data center is recorded in Shelby County