Skip to the content
Data Centers Near Me
Proposed (inferred) Loudoun County · VA

Amazon Bridgefield Tech Center (GW campus, Ashburn)

Ashburn (Loudoun County), Loudoun County, Virginia

Approximate area

Someone has proposed it. Nothing has been approved and nothing is being built.

Status inferred from agw source doc (Sun, 06 Se). No filing states it in as many words.

Open the area in Google Maps
The location is approximate, so it is drawn as an area: a circle 500 metres around the point a directory gives. The directory does not say how that point was made, and the radius is our choice, not a measured error. Other campuses on record nearby are drawn around it.
Status
Proposed (inferred)
Owner
Likely Amazon (AWS)
Capacity
not stated
Location known to
Approximate area
County
Loudoun County
State
Virginia
Electric utility
Not identified
Grid operator
PJM

Location and nearby

Amazon Bridgefield Tech Center (GW campus, Ashburn) is on record as proposed in Loudoun County, Virginia. 389 other campuses are on record within 25 miles, 156 of them within 5 miles. The nearest is 0.78 mi away, measured between approximate points.

Nearest of each kind: Operating 0.78 mi Under construction 3.3 mi Permitted 1.6 mi Proposed 1.0 mi

Nearest campuses on record

What is on record

Owner

Likely Amazon (AWS)

A tracker names this operator and cites a source we have not read ourselves, so it is not traced to a record.

What the signal was
  1. cited document names the operator

    amazon

    Source cited by AI GridWatch for Amazon Bridgefield Tech Center (GW campus, Ashburn): https://wtop.com/loudoun-county/2026/08/concrete-jungle-as-amazon-details-plans-for-new-ashburn-data-centers-some-reside · Sep 5, 2026

Filed by: AMAZON DATA SERVICES, INC. IAD-57 IAD-58

Capacity
not stated
Diesel generators
Air permit on record VA0000005110701054
Water
Not collected. State water withdrawal permits are not in this build.
Electric utility
More than one utility serves this county, and no filing we hold names which one
Also recorded as
AMAZON DATA SERVICES IAD-156, IAD-157, IAD-158, IAD-159, AND IAD-327 · AMAZON DATA SERVICES IAD-215 · AMAZON DATA SERVICES INC IAD-120/121/122 · AMAZON DATA SERVICES INC IAD-161/162 · AMAZON DATA SERVICES INC IAD-667, IAD-668, IAD-669, IAD-670, AND IAD-671 · AMAZON DATA SERVICES, INC. and 6 more

How the status changed

  1. Proposed Sep 5, 2026 inferred

    AI GridWatch stage/outcome: in review|; source press

    Source cited by AI GridWatch for Amazon Bridgefield Tech Center (GW campus, Ashburn): https://wtop.com/loudoun-county/2026/08/concrete-jungle-as-amazon-details-plans-for-new-ashburn-data-centers-some-reside

  2. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

  3. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

  4. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

  5. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

  6. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

  7. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

  8. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

  9. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

  10. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

  11. Permitted Sep 6, 2026

    epa air permit active

    EPA ECHO Exporter, all facilities (weekly refresh)

About this data

Evidence

Primary record

A government filing, a federal permit, an assessor parcel or the operator’s own page.

Location known to

Approximate area

Approximate. Good enough for a neighbourhood, not for a driveway.

Independent sources

2

cited filing, federal permit. Directories count once between them, because they copy each other.

How we build this

Spotted something wrong? Tell us and we will fix it.

Where this comes from

12 source records back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.

Document Role Row Date
Source cited by AI GridWatch for Amazon Bridgefield Tech Center (GW campus, Ashburn): https://wtop.com/loudoun-county/2026/08/concrete-jungle-as-amazon-details-plans-for-new-ashburn-data-centers-some-reside US-VA Context url=https://wtop.com/loudoun-county/2026/08/concrete-jungle-as-amazon-details-plans-for-new-ashburn-data-centers-some-residents-are-fed-up/ Sep 5, 2026 retrieved by us
agw_projects tracker export (AI GridWatch (aigridwatch.com), CC BY 4.0.) US Context id=amazon-bridgefield-ashburn-va Sep 5, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110058901577 Sep 6, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110070107024 Sep 6, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110070624735 Sep 6, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110070791106 Sep 6, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110070824293 Sep 6, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110071219847 Sep 6, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110071251359 Sep 6, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110071949274 Sep 6, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110072102042 Sep 6, 2026 last changed on the server
EPA ECHO Exporter, all facilities (weekly refresh) US Primary REGISTRY_ID=110072129324 Sep 6, 2026 last changed on the server

AI GridWatch (aigridwatch.com), CC BY 4.0.

Free email alerts

Know first when a data center is recorded in Loudoun County

Each time we refresh the public records and a new campus appears in Loudoun County, you get one short email naming it, with the document behind it.

Explore more