Quantum Leap Data Center/ Fisk University
Nashville, Davidson County, Tennessee
Approximate area
Someone has proposed it. Nothing has been approved and nothing is being built.
Status inferred from dce directory (Tue, 08 Se). No filing states it in as many words.
- Status
- Proposed (inferred)
- Owner
- Owner not resolved
- Capacity
- 30 MW directory claim
- Location known to
- Approximate area
- County
- Davidson County
- State
- Tennessee
- Electric utility
- Nashville Electric Service
- Grid operator
- not stated
Location and nearby
Quantum Leap Data Center/ Fisk University is on record as proposed in Davidson County, Tennessee. A directory lists its capacity at 30 MW; no filing we hold states a figure. 24 other campuses are on record within 25 miles, 9 of them within 5 miles. The nearest is 1.4 mi away, measured between approximate points.
Nearest of each kind: Operating 1.4 mi Permitted 1.7 mi Proposed 1.8 mi
Nearest campuses on record
- 1.4 mi approximate
Operating · Davidson County, TN
- 1.6 mi approximate
Operating · Davidson County, TN
- 1.6 mi approximate
Zayo Nashville - 209 10th Ave. S
Operating · Davidson County, TN
- 1.7 mi approximate
Permitted · Davidson County, TN
- 1.8 mi approximate
Proposed · Davidson County, TN
- 2.0 mi approximate
Operating · Davidson County, TN
What is on record
Owner
Owner not resolved
- Capacity
- 30 MW as reported by dce, not from a filing
- Building area
- 70,000 sq ft
- Diesel generators
- No air permit found in the records we collect
- Water
- Not collected. State water withdrawal permits are not in this build.
- Electric utility
- Nashville Electric Service
How the status changed
- Proposed Jun 18, 2026 inferred
DCE status 'proposed'
About this data
Evidence
Directory listing only
One or more public directories list it. We have not matched it to a filing.
Location known to
Approximate area
Approximate. Good enough for a neighbourhood, not for a driveway. The point comes from a directory, which does not say how it was derived.
Independent sources
1
directory. Directories count once between them, because they copy each other.
Spotted something wrong? Tell us and we will fix it.
Where this comes from
One source record back this page. Each row is a document we retrieved and kept, so a claim can be checked against the original.
| Document | Role | Row | Date |
|---|---|---|---|
| dce tracker export (© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.) US | Primary | slug=quantum-leap-data-center-fisk-university | Jun 18, 2026 last changed on the server |
© DataCentersExposed contributors, datacentersexposed.com, ODbL 1.0. Contains data © OpenStreetMap contributors.
Free email alerts
Know first when a data center is recorded in Davidson County
Each time we refresh the public records and a new campus appears in Davidson County, you get one short email naming it, with the document behind it.